The Bafq-Bandar Abbas railway is approximately 600 km long, of which 195 km includes sections 5A, 5B, 13 ,12 and 14, as well as the Tazraj formation station with an area of 9700 squaremeters, which was completed by these consulting engineers inthe60s. This project is one of the most important railway projects in the country due to the construction of the Bafaq-Mashhad-Sarakhs railway and connecting the north to the south of the country.