Zal-Andimeshk freeway was built to complete the Tehran-Bandar amam freeway network. In order to cross Hosseinieh Valley and Rokhaneh, two bridges with prestressed concrete box girder have been built using balanced cantilever. This bridge was chosen as the best bridge of 2013 in the 17th annual concrete and earthquake conference by the International Concrete Institute (ACI).