The Pole Zal-Andimeshk freeway was constructed to complete the Tehran-Bandar Imam freeway network. To cross the Hoseyniyeh River and valley, two bridges with prestressed concrete box girder deck systems were built by this engineering consultant using the balanced cantilever method.