This freeway, which is a part of the communication road between Tehran and Imam Port, is a continuation of the Khorramabad-Zal freeway and is 45 km long. It has 10 bridges, including the Hosseinieh Bridge (span 55+100+55). The construction cost of this freeway is about 3500 billion Rials.