
Due to the need to cross the Asiab Dargah river valley, two bridges were designed and constructed, with a bridge over the western lane already in operation. Considering the location of the valley and river, the bridges were designed in high spans, and a prestressed concrete box girder deck system was used, constructed using the balanced cantilever method.