
Due to its proximity to Rudbar city and its distinctive architectural design, the bridge was named Zeytun Bridge.
1st Phase: Two box girder bridges with lengths of 130 m and 179 m.
2nd Phase: The project consists of two prestressed balanced cantilever bridges, measuring 330 meters and 290 meters in length, connected by a central span of 130 meters. This is the first time in Iran that the modern pendulum support system has been applied in the design of a bridge.